Project Type: Water System Plan, Design and Construction Administration; Sturgeon Lake, MN
Client: City of Sturgeon Lake
LHB planned, designed, and managed construction for a new city-wide water system to serve 260 residential units and a 500-space campground. The water system is composed of a 100,000 gallon elevated water tower, dual 20-HP/ 260-gpm municipal wells, a well house/ chemical feed building, and a 10-mile distribution system. Construction occurred during 2005-2006.